-
19-06-2019 09:04 AM #1
Gold Member- Ngày tham gia
- Dec 2011
- Bài viết
- 1,682
- Được cám ơn 23 lần trong 23 bài gởi
PV Power posts positive results in five months despite difficulties in power generation
PV Power reported positive business results in the first five months of this year despite difficulties the company faced in generating power. Ending May, PV Power generated more than 9.4 billion kWh, completing its target set for the reviewed period. As of June 16, power generation reached 10.56 billion kWh.
This was an encouraging result given difficulties the company faced since early this year, chairman of the PV Power’s board of directors Ho Cong Ky told local media on Monday.
Ky pointed out three issues facing power generation companies this year, of which climate change, especially the El Nino phenomenon, is drying lakes at hydropower plants while the declining gas source and coal supply are pressuring the generation capacity of thermal power plants.
“The coal supply for coal-fired power plants has never suffered the situation of ‘living hand to mouth’ like at present,” Ky said, adding that coal provided by the Viet Nam National Coal Mineral Industries Holding Corp Ltd (Vinacomin) has been declining.
At the meeting, he also reported financial results of the company, of which revenues of the whole corporation reached VND14.8 trillion (US$635.2 million) in the first five months. Its profit after tax is estimated at VND1.3 trillion ($56.6 million), surpassing the target by 29 per cent.
The company paid nearly VND481 billion to the State budget during this period.
In 2019, PV Power aims for total revenue of VND33.9 trillion and net profit of VND2.3 trillion. After five months, the company completed 45 per cent of its annual revenue target and 58 per cent of its profit plan by year-end.
Regarding its investment activities this year, PV Power is hastening efforts to complete the feasibility study report for the Nhon Trach 3, 4 thermal power projects for submission at the annual shareholders’ meeting next year. After getting approval, it will organise bidding to select the EPC (Engineering Procurement Construction) contractors.
The objective of the company was to comply with the Government’s requirement of starting commercial production of the two power plants in 2023, Ky said.
Besides, PV Power is also preparing an investment plan for the Luang Prabang hydropower project in Laos of which PV Power is expected to contribute 38 per cent of capital. He said the company was building a special investment mechanism for this project to submit to the Government to ensure the company’s shareholders’ interest.
The project has two construction schemes: one transferring electricity to Viet Nam will cost about $4.2 billion while the other connecting to Thailand is expected to cost about $3.8 billion.
Shares of the company, coded POW on the Ho Chi Minh Stock Exchange, are being traded around VND15,800 ($0.68) per share, valuing the company at VND37.35 trillion ($1.6 billion).
Thông tin của chủ đề
Users Browsing this Thread
Có 1 thành viên đang xem chủ đề này. (0 thành viên và 1 khách vãng lai)
Similar Threads
-
PV Power targets $1.4b in 2019
By ducvt in forum STOCKs LISTED IN HoSETrả lời: 0Bài viết cuối: 11-01-2019, 09:24 AM -
PV Power listing approved by HoSE
By ducvt in forum STOCKs LISTED IN HoSETrả lời: 0Bài viết cuối: 19-12-2018, 08:46 AM -
PV Gas posts higher-than-expected H1 results
By ducvt in forum STOCKs LISTED IN HoSETrả lời: 0Bài viết cuối: 21-07-2018, 09:08 PM -
SHB posts $59.1m pre-tax profit in 9 months
By ducvt in forum STOCKs TRADING IN HNXTrả lời: 0Bài viết cuối: 02-11-2017, 09:05 PM -
Vinamilk posts 25% revenue gain in first nine months
By xiuchic in forum STOCKs LISTED IN HoSETrả lời: 0Bài viết cuối: 20-10-2012, 12:47 PM
Bookmarks